Baumeisterarbeiten
New residential building Predazzoallee, Hallbergmoos
Baumeisterarbeiten
approx. 1200 m² floor slab in WU concrete
approx. 1300 m³ in-situ concrete walls (of which approx. 550 m³ exterior walls in WU concrete)
ca. 3400 m² Ortbetondecken
approx. 1200 m² masonry in thermal insulation bricks
Precast reinforced concrete elements (approx. 24 balcony slabs, approx. 8 stairways, approx. 3 light and ventilation shafts, filigree ceilings)
approx. 253 t structural steel
ca. 900 m² Perimeterdämmung
approx. 800 m² ceiling insulation inside wood wool multilayer panels
ca. 1000 m² x (OS 8/OS 10)
Ground pipes (approx. 75 m KG 2000 pipe, DN 100)
20 Stahlblechtüren (T30/RS)
Construction site equipment (crane position, construction fence, AG construction management container, sanitary container, construction water connection, safety measures, etc.)