Cladding works | Tenderlake

Cladding works

Contract Value:
GBP 5M -
Notice Type:
Contract Notice
Published Date:
08 August 2022
Closing Date:
09 September 2022
Location(s):
UKI43 Haringey and Islington (UK UNITED KINGDOM)
Description:
T1-5851 Archway Heights

1.2.1 Origin Housing Limited requires the replacement of existing external cladding (including sheathing board, insulation, fire breaks, helping hands/rails, vapour barrier etc) to Archway Heights residential block.

The building is a nine-storey residential tower block constructed with a reinforced concrete frame, with a steel frame (SFC) and clad using cement particle sheathing board, rigid board PIR insulation, vapour barriers, edpm, intumescent fire breaks and aluminium cladding on a hook railing system. This project comprises the removal of the existing system in its entirety (including the existing sheathing board, insulation, fire barriers, ply parapets, edpm, vapour barrier etc.) and replacing with a calcium silicate/versa panel sheathing board, mineral insulated system with a certified Euroclass rating to BS EN 13501 of A1/A2, edpm, vapour barriers, helping hands rail system fire barriers, with external appearance to match the existing appearance and including all associated work. This work is to be completed whilst the building remains in full occupation.

Download full details as .pdf
The Buyer:
Origin Housing
CPV Code(s):
45262650 - Cladding works
45320000 - Insulation work
45453100 - Refurbishment work