The outdoor terrace pool in Frechen is being extensively renovated structurally and technically. In the course of the renovation, the swimmer, non-swimmer and diving pools will be lined with stainless steel pools and the entire bathing water technology will be renewed. The changing rooms and sanitary facilities will also be revised.
Under lot 1, the necessary construction site equipment is to be offered, containers with sanitary facilities are to be set up as well as office and storage containers for equipment and storage areas or storage facilities.
Lot 2 contains the demolition work, which provides for the dismantling of the existing concrete pool heads including gutters and is intended to prepare the pools for the new stainless steel elements. The gutting of sanitary buildings and the production of wall and floor openings in the area of the existing bathing water technology are also components.
Lot 3 Earthworks includes the installation of paving areas, excavations and trenches for ground pipes, as well as the excavation of soil for an underground building for bathing water technology.
In Lot 4, the ground pipes in the trenches constructed under Lot 3 shall be inserted or laid.
Finally, Lot 5 will be used to construct a pump room for the new bathing water technology and a splash water basin in a planned underground building will be made of WU concrete.
site equipmentUnder lot 1, the necessary construction site equipment is to be offered, containers with sanitary facilities are to be set up as well as office and storage containers for equipment and storage areas or storage facilities.
demolition workLot 2 contains the demolition work, which provides for the dismantling of the existing concrete pool heads including gutters and is intended to prepare the pools for the new stainless steel elements. The gutting of sanitary buildings and the production of wall and floor openings in the area of the existing bathing water technology are also components.
earthworkLot 3 Earthworks includes the installation of paving areas, excavations and trenches for ground pipes, as well as the excavation of soil for an underground building for bathing water technology.
underground pipesIn Lot 4, the ground pipes in the trenches constructed under Lot 3 shall be installed or laid.
Concrete and masonry workLot 5 is the construction of a pump room for the new bathing water technology and a splash water basin in a planned underground building is to be made of WU concrete.