Basic renovation of the listed platform hall, including lighting and lightning protection, as well as preparatory work for the installation of an elevator on platform 9/10 of Görlitz station. The three-nave hall roof extends over a length of approx. 125m and a total width of approx. 60 m. In order to carry out the renovation work, a sliding steel structure of about 60 m long must be constructed, which is moved lengthwise for each hall ship and serves as a support level for the room scaffolding. Railway operation is largely maintained during the work. Appropriate protective measures for travellers should be provided.
Extent of the work:
— approx. 9,500 m
— approx. 50 tonnes of replacement of corrosion-weakened components and scheduled reinforcement measures,
— approx. 4 600 m
— approx. 7 400 m
— approx. 75 t scaffold construction,
— approx. 3 000 m
— preparatory work (earthwork, concrete works) for a new elevator system on platform 9/10,
— approx. 3 200 m cable laying,
— approx. 180 new platform and ceiling lights,
— div. related services.