Restoration of the functionalities of the Rhone-Rhine Canal - 1st phase
Construction of lock 74bis - Civil engineeringConstruction of lock 74bis - Civil engineering
Resumption of locks 64 to 74bis - repair and sluiceResumption of locks 64 to 74bis - repair and sluice
Lock Equipment - Connection & AutomationLock equipment - connection and automation
Waterproofing of the west bank of the reach 64 - wallWaterproofing of the west bank of the reach 64 - wall
Waterproofing of the east bank of reach 64 - sheet pilesWaterproofing of the east bank of reach 64 - sheet piles
Treatment of Artzenheim cork - Civil engineering and metalworkTreatment of Artzenheim cork - Civil engineering and metalwork