The contractor must essentially perform the following activities:
- Designing and creating a weaving section with an emergency lane on the northern roadway between the Sliedrecht-West and Papendrecht connections,
- Designing and realizing a permanent third lane on the southern roadway between the Sliedrecht-Oost and Papendrecht connections. The existing
The rush-hour lane is hereby canceled.
- Necessary maintenance work on the asphalt pavements on the A15 has been added to the project. It concerns the replacement of
Asphalt coatings. By carrying out (variable) maintenance combined with the realization of the A15 PaS project, traffic disruption is limited.
See the already completed field with regard to the short description.