The subject of the contract is the design and execution of construction works for the section of the S74 Kielce – Nisko expressway, section. Cedzyna – Łagów with the Łagów bypass.
The investment is located in the Świętokrzyskie Voivodeship in the Kielce poviat. As part of the investment in question, it is planned to build a dual carriageway expressway on the Cedzyna-Łagów section together with the Łagów bypass, about 30.015 km long.
The investment is located in the Świętokrzyskie Voivodeship in the Kielce poviat. As part of the investment in question, it is planned to build a dual carriageway expressway on the Cedzyna-Łagów section together with the Łagów bypass, about 30.015 km long. Ultimately, the investment in question is aimed at adapting the existing national road No. 74 to the parameters of a dual carriageway. The implementation of the above-mentioned section of the S74 road will enable transit traffic to be routed bypassing the dense buildings located along the existing road. The construction of the bypass of Łagów, road junctions, engineering structures, including road viaducts, bridges, animal crossings, additional roadways to service adjacent areas will improve traffic conditions and increase the level of road safety.
Contract value above EUR 20 million