the consultation concerns restructuring and extension work on the Paul Langevin school group and its sports facility in Grigny. The operations carried out will be as follows: The removal of asbestos from the networks present in crawl space, the partial demolition of the structure, floors, slits, paving, the reconstruction of new in the existing, the replacement of all the exterior joinery and the implementation of insulation from the outside, the creation of extensions connected to the existing structure, the rehabilitation of City Park, the resumption of outdoor facilities and interior and exterior courtyards. The work undertaken will allow the creation of 4 additional classes, thus increasing from 20 to 24 classes. The maximum enrolment will be 533 students and 63 staff. In fact, the establishment is an ERP type R with type N activities, classified in 3rd category
AsbestosAsbestos removal work
Sports equipment - Floor markingsRefer to the consultation documents
macro-Lot A composed of the following lots: lot 02 "Demolition" and lot 03 "Structural work"Refer to the consultation documents
macro-Lot B composed of the following lots: - lot 04 "Frame"; - lot 05 "Exterior joinery"; - lot 06 "Locksmith"; - lot 07 "Ravalement"; - lot 08 " Cover, Sealing "Refer to the consultation documents
macro-Lot C composed of the following lots: - lot 11 "Partitions, Linings, False Ceilings"; - lot 12 " Painting "Refer to the consultation documents
macro-Lot D composed of the following lots: - lot 15 "Electricity"; - lot 17 " Photovoltaics "Refer to the consultation documents
Interior joinery - custom furniture - signageRefer to the consultation documents
Floor and wall coveringsRefer to the consultation documents
ElevatorRefer to the consultation documents
HVAC and plumbingRefer to the consultation documents
GTB (Technical building management)Refer to the consultation documents
VRDRefer to the consultation documents
CookedRefer to the consultation documents
outdoor facilities/green spacesRefer to the consultation documents