New construction of a sports hall at the Berufskolleg Bocholt West
Gewerk: KG 420 Wärmeversorgungsanlagen:
1 pc heat pump approx. 40 kW
1 pc condensing boiler approx. 200 kW
1 pc fresh water station
1 pc heating circuit distribution with heating distributor with 10 nozzles and 4 heating circuits
1 pc pressure retention and degassing
1 pc buffer tank 2,000 liters
1 pc buffer tank 750 liters
6 pcs speed-controlled heating circulation pumps
1 pc gas connection DN 40
approx. 650 m Cu pipe with thermal insulation nominal diameters from DN 15 to DN 50
approx. 50 m black steel pipe with thermal insulation in nominal diameters from DN 15 to DN 50
approx. 1,150 m² underfloor heating with approx. 3,500 m pipe and approx. 45 heating circuits
ca. 180 m Deckenstrahlplatten
approx. 8 radiators
Gewerk: KG 420 Wärmeversorgungsanlagen:
1 pc heat pump approx. 40 kW
1 pc condensing boiler approx. 200 kW
1 pc fresh water station
1 pc heating circuit distribution with heating distributor with 10 nozzles and 4 heating circuits
1 pc pressure retention and degassing
1 pc buffer tank 2,000 liters
1 pc buffer tank 750 liters
6 pcs speed-controlled heating circulation pumps
1 pc gas connection DN 40
approx. 650 m Cu pipe with thermal insulation nominal diameters from DN 15 to DN 50
approx. 50 m black steel pipe with thermal insulation in nominal diameters from DN 15 to DN 50
approx. 1,150 m² underfloor heating with approx. 3,500 m pipe and approx. 45 heating circuits
ca. 180 m Deckenstrahlplatten
approx. 8 radiators