Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
07 May 2019
Closing Date:
17 June 2019
Location(s):
DE DEUTSCHLAND (DE Germany/DEUTSCHLAND)
DEB35 Mainz, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Acoustic measures Fire protection casino building

For the renovation of the casino building of the ZDF in Mainz the following acoustic measures are announced:

- Acoustic wall absorber with textile surface, round, D = 1 500 mm - 4 St.

- Wall absorber with textile sound effect cover in different designs and dimensions - 12 pieces (total: approx. 20 m 2 )

- Partition elements suspended in various designs and dimensions - 29 pcs. (Total: approx. 30 m 2 )

- Acoustic partition walls modular 1.20 x 1.35 m, textile; in different versions: 1-fold to 5-fold - 75 pieces,

- individual to be printed acoustically effective wall covering (seamless textile surface including absorber material) - ca.80 m 2 ,

The renovation takes place during ongoing operation from / to

1st BA: from 12.03.2018, construction time approx. 16 months;

2nd BA: from August 2019, construction time approx. 16 months.

The acoustic measures will be carried out from August 2019 until probably September 2019.

For the renovation of the casino building of the ZDF in Mainz the following acoustic measures are announced:

- Acoustic wall absorber with textile surface, round, D = 1 500 mm - 4 St.

- Wall absorber with textile sound effect cover in different designs and dimensions - 12 pieces (total: approx. 20 m 2 )

- Partition elements suspended in various designs and dimensions - 29 pcs. (Total: approx. 30 m 2 )

- Acoustic partition walls modular 1.20 x 1.35 m, textile; in different versions: 1-fold to 5-fold - 75 pieces,

- individual to be printed acoustically effective wall covering (seamless textile surface including absorber material) - ca.80 m 2 ,

The renovation takes place during ongoing operation from / to

1st BA: from 12.03.2018, construction time approx. 16 months;

2nd BA: from August 2019, construction time approx. 16 months.

The acoustic measures will be carried out from August 2019 until probably September 2019.

Download full details as .pdf
The Buyer:
ZDF
CPV Code(s):
45000000 - Construction work