The order includes the technical planning technical equipment acc. Part 4 Section 2 HOAI AG 1-6 and 8 for the construction of a day care center, Pestalozzistraße, in Kandel. There is currently a public playground on the property. A daycare center with a maximum of 6 groups is planned. The Estimated Order Amount refers to the awarding of the planning services for the KiTa with 6 groups. Alternatively, a reduced size or a design in two stages can be executed. As part of a preliminary investigation, a two-storey, detached building with a second structural escape route over a balcony was proposed.
, Framework dates: Creation of HU construction until the end of 2019 Start of construction in mid-2020 Completion mid-2021
, The construction costs were estimated at the present state of knowledge for a KiTa with 6 groups in a construction phase of approx. 3 680 000 EUR KG 300 and 400 gross. The proportions of the cost groups are assumed to be 79% KG 300 and 21% KG 400.
The order includes the technical planning technical equipment acc. Part 4 Section 2 HOAI AG 1-6 and 8 for the construction of a day care center, Pestalozzistraße, in Kandel. There is currently a public playground on the property. A daycare center with a maximum of 6 groups is planned. The Estimated Order Amount refers to the awarding of the planning services for the KiTa with 6 groups. Alternatively, a reduced size or a design in two stages can be executed. As part of a preliminary investigation, a two-storey, detached building with a second structural escape route over a balcony was proposed.
- Framework dates: Creation of HU construction until the end of 2019 Start of construction in mid-2020 Completion mid-2021,
- The construction costs were assessed at the current level of knowledge for a KiTa with 6 groups in a construction phase of approximately 3 680 000 EUR KG 300 and 400 gross. The proportions of the cost groups are assumed to be 79% KG 300 and 21% KG 400.