The required fire alarm system is provided in the new building in the basement, in a fire-free room. This room is ventilated. This is done accordingly with fire dampers.
The new building is alerted and monitored accordingly via this system.
The system in the inventory is intended as "BUZ" (fire alarm sub-control center).
This sub-center will be networked with the system in the new building.
All fire brigade facilities are planned or planned in the new building.
The wiring in both buildings is done by the ELT trade. The necessary coordination with external trades must be coordinated independently.
Leading masses:
- 1 fire alarm center;
- 1 pc fire alarm control panel;
- 2 floor terminals;
- approx. 46 manual call points;
- approx. 430 fire detectors;
- approx. 25 m PVC pipe for aspirating smoke detectors in the elevator shaft;
- Air sample set for ventilation unit;
- Combination console including FSD and FSE;
- DSL / GSM transmission device;
- Fire service information and operating system.
The required fire alarm system is provided in the new building in the basement, in a fire-free room. This room is ventilated. This is done accordingly with fire dampers.
The new building is alerted and monitored accordingly via this system.
The system in the inventory is intended as "BUZ" (fire alarm sub-control center).
This sub-center will be networked with the system in the new building.
All fire brigade facilities are planned or planned in the new building.
The wiring in both buildings is done by the ELT trade. The necessary coordination with external trades must be coordinated independently.
Leading masses:
- 1 fire alarm center;
- 1 pc fire alarm control panel;
- 2 floor terminals;
- approx. 46 manual call points;
- approx. 430 fire detectors;
- approx. 25 m PVC pipe for aspirating smoke detectors in the elevator shaft;
- Air sample set for ventilation unit;
- Combination console including FSD and FSE;
- DSL / GSM transmission device;
- Fire service information and operating system.