Kronsrode Cluster C, disposal of soil; Framework contract
Kronsrode Cluster C, framework contract for the disposal of soil.
- 14 140 m 3rd Drive off and dispose of the top shelf unloaded;
- 7,070 m 3rd Remove and discard top shelf Z1.1;
- 3,540 m 3rd Remove and discard top shelf Z1.2;
- 9,690 m 3rd Drive off and dispose of floor Z0 *;
- 4,840 m 3rd Drive off and dispose of floor Z1.1;
- 2,420 m 3rd Drive off floor Z1.2 and dispose of it.