The SHS Strukturholding Saar is building the Saarbrücken City Police Inspection, including a public car park, on an area already used by the police on Mainzer Strasse in Saarbrücken. The new building of the PI SB police department is being built in the southeast area of the site. Area 6019 m²; address: “Mainzer Straße 132, 66121 Saarbrücken”. The police department consists of three components, the police department, the custody and the parking garage. All components are constructed as solid structures in reinforced concrete construction and are based on in-situ concrete bored piles.
The Police Inspectorate (PI) has 3 full floors plus a technical center on the roof, grouped around two atriums. On the ground floor there is a delivery yard with a single-storey custody wing. External dimensions of the main building approx. 62 x 38 m. External dimensions of the Andienungshof ground floor approx. 55 x 15 m
Multi-storey car park (PH): 5 staggered storeys, external dimensions approx. 55 x 33 m, total car parking spaces: 373.
The subject of this invitation to tender is the "metal façade".
The subject of this invitation to tender is the "metal façade" as the subject lot of the overall construction project.
- construction site equipment for your own performance
- Planning and preparation (façade statics & W+M)
Metal façade (perforated sheet):
- Hydrophobic primer (concrete): approx. 850 m²
- Facade painting deep black (concrete): approx. 850 m²
- Substructure perforated sheet metal façade (aluminium anodised / powder coating): approx. 1100 m²
- Aluminium perforated metal façade anodised (rectangular cut-outs): approx. 1100 m²
- Insektenschutzgitter: ca. 650 m
- Continuous weather bank. approx. 60 m
- Attikablech: ca. 120 m