Interior plaster and painting work.
The Gymnasium Justus-Liebig-Schule is located in the city center of Darmstadt "in the school island",
Address:
Landwehrstrasse 28
64293 Darmstadt.
The building is a listed building and was built in 1911 four-tiered in strict axiality under planning by city architect August Buxbaum as Higher Boys' School and adjoins the south side of the adjacent gymnasium. The old building has a basement projecting halfway out of the ground floor and 4 above-ground storeys as well as the attic, which will be expanded as part of the refurbishment for classrooms.
Building dimensions:
- Length approx. 60 m,
- width about 24 m,
- Height above ground to first: about 26.50 m.
Existing construction:
- concrete foundations,
- Reinforced concrete ceilings with steel beams (Koenensche Voutendecken),
- masonry of bricks, facade in the base with natural stone clothing,
- Roof construction, hipped roof (post-war period) as rafter roof with filigree trusses, slate roofing.
Activities:
The necessary work essentially involves the total renovation of the building inside. The outer shell with façade, windows and roof was already renovated a few years ago. The building is dismantled except in the stairwells and the corridors down to the shell construction.
- dismantling of all surfaces, (floor, sloping ceilings),
- Partial renewal of the wall plasters.
Installation interior insulation exterior walls:
- upgrading the ceilings fire protection plaster,
- Installation of handicapped accessible elevator,
- renewal of floor structures,
- installation of acoustic ceilings,
- Complete renovation of the building services
- installation underfloor heating,
- renovation of the sanitary facility,
- Renewal of the electrical installation.
construction process:
The school itself is outsourced. The construction work will not be carried out during ongoing operation; However, the schoolyard will continue to be used and the requirements. Construction site layout plan must be adhered to.
Scope of the advertised service Plaster and painting work:
- Humidity control plaster External walls UG: 1.3000,00 m
- Innenendämmputz exterior walls ground floor - 3rd floor: 480.00 m
- Lime cement plaster WC rooms: 150.00 m
- Light plaster on aerated concrete: 1 150.00 m
- Revision lime plaster UG- 3rd floor: 7 500.00 m
- Kalkglätte UG- 3.OG: 8 500.00 m
- Painting walls silicate paint UG-DG: 11 000.00 m
- Painting ceilings Silicate paint UG-DG: 7 000.00 m
- Painting Stair railing + steel frames: 200 running meters