Løgstrup Heat Plant has received a commitment from the Danish Energy Agency for financial support to establish a heat pump,
It can use outdoor air as a heat source. The heat pump must be established on Kølsenvej 27, approx. 300 m northeast of the existing work. On Kølsenvej 27, in connection with the establishment of solar heating systems in 2016,
established a smaller engineering building and an associated accumulation tank.
This comprehensive contract covers all deliveries and works related to the establishment of a complete heat pump system with stipulated services and options.
Click here https://permalink.mercell.com/116527122.aspx
The total contract includes preparation of retail design.
The heat pump must be installed in a new engineering building contained in this contract.
The total contract contains:
Connection, supply and installation of complete electric powered heat pump system including engineering building, with one
heat output of at least 2.6 MW heat, at an outdoor air temperature of -1
The contractor is informed that the size of the heat pump, min. 2.6 MW is indicative.
The builder wants, the total economic optimal heat pump configuration, why the total contractor
are encouraged to optimize the COP value and heat pump heat output.
The total contract includes:
- Delivery and installation of the complete heat pump incl. coating work, cooling fence and
soakaway,
- Associated with complete engineering building,
- Preparation of retail design,
- Documentation for compliance with noise requirements (internal and external),
- Hydraulic calculations,
- Function and management description,
- All piping and electrical work on the heat pump and engineering building,
- Connection to existing district heating networks in current engineering building,
- Connection of heat pump to the electricity supply network at 10 kV level.
Under this total contract, a complete electricity supply and installation must therefore be established for
heat pump. The integration with the plant's current SRO plant must be done in collaboration with the plant's own SRO supplier. The heat pump must be established in a new engineering building. The new engineering building is included in this contract. It is the responsibility of the contractor to arrange all installation, pressure testing, start-up and commissioning of the plant in consultation with the developer, so that there is no risk of disruptions to the solar heating system, the other production and / or distribution from the heating plant.