Development of design documentation for the reconstruction of the gas network - 6 Tasks
Task 1 – Zgierz, Promienistych StreetPreparation of design documentation for the reconstruction of the gas pipeline with connections in Zgierz, Promienistych Street in accordance with the Technical Conditions No. PSGLO/ZMDZ/ZMSM/145/2022/G/P
- medium pressure gas pipeline PE 63 mm with a length L = approx. 275 m
- PE gas connections 25 mm pcs. 15 including connection to the existing gas installation located in the buildings
- switching of existing PE connections pcs. 8
Task 2 – Łódź, Sitowie StreetDevelopment of design documentation for the reconstruction of the gas pipeline with connections in the m. Sitowie, Pstrągowa, Telimeny, Romantyczna, Heliński, Grudzińskiego, Balladyna, Julia, Sikorskiego street in accordance with technical conditions no. PSGLO/ZMDZ/ZMSM/139/2022/G/P
- medium pressure PE 90 mm gas pipeline with a length L = approx. 65 m
- medium pressure gas pipeline PE 110 mm with a length L = approx. 1 428 m
- medium pressure GAS pipeline PE 160 mm with a length L = approx. 1 099 m
- medium pressure gas pipeline PE 225 mm with a length L = approx. 757 m
- PE gas connections 40 mm pcs. 2 including connection to the existing gas installation located in the buildings
- PE gas connections 63 mm pcs. 17 with connection to the existing gas installation located in the buildings
- PE gas connections 90 mm pcs. 32 including connection to the existing gas installation located in the buildings
- switching of existing PE connections pcs. 11
Task 3 – Łódź, Podmiejska StreetPreparation of design documentation for the reconstruction of the gas pipeline with connections in Łódź, Podmiejska Street, Słowackiego in accordance with technical conditions no. PSGLO/ZMDZ/ZMSM/121/2022/G/P
- low pressure gas pipeline PE 160 mm with a length L = approx. 222 m,
- PE gas connections 63 mm pcs. 2 including connection to the existing gas installation located in the buildings
- switching of existing PE connections pcs. 4
Task 4 – Łódź, Górnicza StreetPreparation of design documentation for the reconstruction of the low-pressure gas pipeline PE 125 mm with a length L = approx. 291 m in the city of Łódź, Górnicza Street in accordance with the Technical Conditions No. PSGLO/ZMDZ/ZMSM/86/2022/G/P
Task 5 – Aleksandrów Łódzki, Daszyńskiego StreetDevelopment of design documentation for the reconstruction of the gas pipeline in m. Aleksandrów Łódzki, Daszyńskiego Street in accordance with the Technical Conditions no. PSGLO/ZMDZ/ZMSM/140/2022/G/P
- medium pressure PE 40 mm gas pipeline with a length L = approx. 148 m (reach)
- PE gas connections 25 mm pcs. 2 including connection to the existing gas installation located in the buildings
- switching of existing PE connections pcs. 2
Task 6 – Rzgów, Grodziska StreetPreparation of design documentation for the reconstruction of the gas pipeline in Rzgów, Grodziska Street in accordance with the Technical Conditions No. PSGLO/ZMDZ/ZMSM/163/2022/G/P
- medium pressure gas pipeline PE 225 mm with a length L = approx. 1 060 m
- PE 40 mm gas connections with connection to the existing gas installation located in buildings
- switching of the existing PE 160 mm gas pipeline
- switching of existing PE connections