Civil Engineering - Foundation Work & Civil Engineering
Civil engineering and sewer construction work is to be carried out for the Campus Handwerk project of the Halle (Saale) Chamber of Crafts.
The following coarse masses are included in the construction work:
- 1.00 Psch Construction site equipment & proofs for sewer construction & foundation cushion
- 1,050.00 m² Temporary construction road for access road
- 1,200.00 m³ topsoil removal and windrow storage
- 11,100.00 m Remove and dispose of the top course without binder
- 400.00 m sewer and pipe demolition up to DN/OD 250
- 50,00 pcs Shaft demolition DN 400 to DN 1000
- 18,500.00 m³ earthworks for halls and foundation cushions (loosening, loading & recycling soil)
- Supply and install 12,750.00 m³ of frost protection layer for halls
- 657.00 m sewer & earthworks (DN/OD 160 - 315 PP, T up to 3.50 m)
- 30.00 pcs waste water shafts (DN 400 - 1000 PP, T up to 3.50 m)
- 2,005.00 m storm sewer & earthworks (DN/OD 110 - 400 PP, T up to 3.50 m)
- 32.00 pcs rainwater shafts (DN 400 - 1000 PP, T up to 3.50 m)
- 2.00 pcs sedimentation plants & earthworks (DN 1025 PP, L = 6.00 m, T up to 4.00 m)
- 2730.00 m³ earthworks for trench boxes (T up to 2.50 m)
- 1175,00 pcs Storage elements, trench boxes made of PP
- 1800.00 m² PE film as retention system film incl. welding work
- 1.00 pcs throttle shaft incl. vortex throttle
- 405.00 m drinking water pipeline & earthworks (DA 75 - 110 PE 100 RC, T up to 2.00 m)
- 190.00 m gas pipeline & earthworks (DA 63 - 160 PE 100 RC, T up to 2.00 m)
- 35.00 m exhaust air duct & earthworks (DN 400 St, T up to 2.50 m)
- 52.00 m exhaust air duct & earthworks (DN 600 St, T up to 2.50 m)
- Move 1.00 pieces of reinforced concrete structure (exhaust air) (L x W x H = 4.20 x 4.20 x 3.00 m)
- 110.00 m earthworks for power and data cables (T to 1.25 m)
- 2,005.00 m cable conduit & earthworks (DN/OD 110 PE, T up to 2.00 m)
- 11.00 pcs cable construction shafts & earthworks (up to L = 1.40 m x W = 0.80 m, D up to 2.00 m)