- 1 piece laying of pipes in the controllable horizontal flush drilling method flush drilling method DWA-A 125 da 140
- 1 piece laying of pipes in the controllable horizontal flush drilling method flush drilling method DWA-A 125 da 160
- 50m³ soil exchange
- 6750m cable laying incl. delivery NA2XS(F)2Y 3x1x300 RM/25 A1 number 435
- Produce 42 connecting sleeves
- Make and close 42 socket holes
- Measure 3380m route
- Safety measures for route expansion
- 1 piece laying of pipes in the controllable horizontal flush drilling method flush drilling method DWA-A 125 da 140
- 1 piece laying of pipes in the controllable horizontal flush drilling method flush drilling method DWA-A 125 da 160
- 50m³ soil exchange
- 6750m cable laying incl. delivery NA2XS(F)2Y 3x1x300 RM/25 A1 number 435
- Produce 42 connecting sleeves
- Make and close 42 socket holes
- Measure 3380m route
- Safety measures for route expansion