Heating, ventilation and air-conditioning installation work | Tenderlake

Heating, ventilation and air-conditioning installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
09 December 2022
Closing Date:
16 January 2023
Location(s):
DE300 Berlin (DE Germany/DEUTSCHLAND)
Description:
Heating/sanitation I New construction of a youth training centre of the 1st FC Union Berlin e.V

Construction of a youth centre for the youth training centre of the 1st FC Union Berlin e.V. This new building is divided into two construction phases, BT1 as a two-storey building and component 2 as a single-storey building. The new building will not have a basement, in the eastern area is to be founded deeper by a 700 mm rainwater pipe. The outer walls consist mainly of sand-lime bricks, the ceilings of concrete ceilings (filigree ceilings). The two-storey building will have an extensively greened roof, the single-storey building a football court.

Heating / plumbing with the services:

- Local heating pipe 35 m, 2 x DN 80. Media pipe made of cross-linked polyethylene, insulation made of polyurethane high-pressure foam with thermal conductivity Y50 ≤ 0.0260 W/mK (Ø 160 mm)

- Central heating system consisting of: pressure maintenance with automatic replenishment, combined supply and return distributor 180/180 with horizontally welded hydraulic diverter underneath, heating circuit control with high-efficiency pumps, hydraulically separated transfer station for LTA, drinking water heating with high-performance fresh water tank, building automation for the heating centre

- Heat distribution systems stainless steel system pipes CrNi 1.4301, approx. 800 m, d15x1mm to d35x1.5mm, including stainless steel pressfittings CrNiMo steel 1.4401, shut-off and string control valves, pipe fasteners and thermal insulation according to EnEV

- Heat distribution systems C-steel system pipe externally galvanized, approx. 1,900 m, d15x1mm to 88.9x2mm, including pressfittings, shut-off and string control valves, pipe fasteners and thermal insulation according to EnEV

- Space heating surfaces consisting of: 16 pcs underfloor convectors, 3 units free-standing hood convectors, 4 pcs bank radiators, 119 pcs. Plan hygienic compact radiators

- Drinking water house connection pipe, underground, approx. 120 m, PE pressure pipeline PE100-RCDN80 from meter transfer shaft BWB to house feed R0.38.

- Drinking water house feed with filter backwash automatic, TW softening system, TW pressure booster system

- Drinking water installation pipes stainless steel system pipe 1.4401 CrNiMo, approx. 2450 m, d15x1mm to d88.9x2mm, including pressfittings, shut-off and string control valves (circulation), pipe fasteners and thermal insulation according to EnEV

- Water management with control of sanitary tapping fittings for washbasins and showers

- 188 pcs. installation elements for washbasins, showers, sinks, wall-mounted toilets and urinals

- Sanitary facilities, such as 80 pcs. showers, 37 pcs. washbasins, 6 pcs. sinks, 41 pcs. WC's and urinals

- Laundry and dry cleaning facilities

- 86 stainless steel shower channels, 16 pcs floor drains

- Sewage plumbing systems approx. 340m d40 to d90, including fittings and pipe fasteners

Download full details as .pdf
The Buyer:
1. FC Union Berlin e. V.
CPV Code(s):
45331000 - Heating, ventilation and air-conditioning installation work
45332000 - Plumbing and drain-laying work