3.2. The subject of the contract is the execution of: Construction of a water supply network with connections to buildings in the road strip of Piszczory Street and Walkosze Street in Zakopane.
The scope of the contract includes the reconstruction of the network and water supply connections with a total length of 538.3 m, including:
- Ø 160 mm PE – 42.5 m
- Ø 90 mm PE – 468.3 m
- Ø 63 mm PE – 2.3 m
- Ø 50 mm PE – 5.3 m
- Ø 40 mm PE – 10.5 m
- Ø 32 mm PE – 9.4 m
- prefabricated reinforced concrete reducing chamber - pcs. 1
The subject of the contract is the execution of: Construction of a water supply network with connections to buildings in the road strip of Piszczory Street and Walkosze Street in Zakopane.
The scope of the contract includes the reconstruction of the network and water supply connections with a total length of 538.3 m, including:
- Ø 160 mm PE – 42.5 m
- Ø 90 mm PE – 468.3 m
- Ø 63 mm PE – 2.3 m
- Ø 50 mm PE – 5.3 m
- Ø 40 mm PE – 10.5 m
- Ø 32 mm PE – 9.4 m
- prefabricated reinforced concrete reducing chamber - pcs. 1