New decommissioning facility offering deepwater quay, extensive quayside laydown area, very heavy lifting capability and processing area. The deepwater dredging works consist of the removal of approximately 201,000 cubic metres of which 90,000 cubic metres is in a deepwater area, with 111,000 cubic metres dredging soft for reclamation/fill. It is likely that some combination of back-hoe and trailer-suction dredging will be used for the bulk of the work. Approximately 30,000m2 of quay area will be created with associated infrastructure works.