General planning services (object planning, structural planning, technical equipment, civil engineering structures) Work phases 5-9 or 5-6 (structural planning) for the construction of an energy centre with wastewater pumping station for the district supply in parq54 (formerly GvS barracks) on the basis of an existing planning ready for planning application.
Engineering services for the construction of a supply system on the site of the former General-von-Seidel-Kaserne in Trier. The construction project is intended to supply the planned industrial park with heat. Likewise, the wastewater of the entire area is to be discharged into the public water channel.
The planned new building is divided into two above-ground floors and includes the following uses:
a. Central heating system. On the ground floor and upstairs.
b. Transformer stations. Two transformer stations and a medium and low voltage room on the ground floor.
c. Sewage pump shaft. Underground facility, partly outside the building.