Carpentry work on interior doors on the 4th construction phase during the general renovation of a grammar school
Gross volume (BRI) BA IV:
(after refurbishment)
BT C: 5.881,50m³
Generally:
Münsterschwarzach Abbey intends to renovate the Egbert Grammar School.
The renovation includes the components A-G.
The adjacent gymnasiums are not part of the renovation measure. The scope of the contract relates to the 4th construction phase, which concerns component C.
Main positions:
- 4 HPL doors with steel block frames, 1 of which is in fire protection T90-RS
- 17 wooden doors with wooden block frames, 1 of which is in fire protection T30
- 1 piece of sliding doors - installation in drywall pockets