Avinor AS shall extend the terminal building at Stavanger Airport Sola with approx. 2 700 m². About 950 m² is an extension and reconstruction of the ground floor baggage system area, approx. 1 290 m² for passengers and commercial use in 1st floor and the rest is allocated to technical equipment rooms.
The baggage sorting system and passenger area is located airside and residue areas on landside. The ground floor outer wall airside is a concrete construction with reinforced concrete elements. 1st floor outer wall is made of frameworks and window areas. The landside extension is erected as steel framework with timber frames. The construction work is being performed while the airport is in operation.
This contract and scope of work covers the following deliverables:
— Insulation and roofing of complete roof covering the baggage sorting area of approx. 950 m²,
— Insulation and roofing of complete roof covering the technical equipment rooms of approx. 230 m²,
— Optional: Insulation and roofing of roof covering a potential extension of the baggage sorting area of approx. 340 m².
Contract award is planned to take place primo September 2014. Preliminary plan for site execution is from 19.11.2014 to 30.12.2014.