Measure: New Friedrich-Rückert-Gymnasium Ebern
Service: Demolition and disposal of the specialist classroom wing (BA 2)
Demolition:
- Arbeitsgerüst: ca. 1,500 m2
- Roofing of roof attics and shed parapets: approx. 1,200 m2
- Covering shed areas and crowns: approx. 1,400 m2
- asbesthaltiger Schwarzanstrich Dachattiken: approx. 200 m2
- Abhangdecke Holzlamellen + KMF: ca. 2.500 m2
- Leichtbauwände GK + KMF: ca. 1.200 m2
- Joint sealants containing PCBs, continuous rooflights: approx. 1,100 m
- PCB-containing paints In-situ concrete walls: approx. 1,000 m2
- Demolition of part of the building on the ground floor: 1 pc.
- Demolition of building part KG: 1 pc.
- Betonpflaster, d 8cm: ca. 320 m2
- Foundations 2.0 muGOK: approx. 290 m3
- Preparing soil material, transporting interim storage: approx. 2,000 m2
- Improve and install floor material: approx. 500 m3
Disposal:
- Provide concrete RC material: approx. 350 m3
- BS mixtures RC-1: approx. 790 t
- BS mixtures RC-2: approx. 600 t
- BS mixtures RC-3: approx. 600 t
- BS mixtures DK 0: approx. 100 t
- BS mixtures up to DK II: approx. 100 t
- Old wood treated/coated: approx. 80 t
- AIV-Holz: ca. 40 t
- Construction and demolition waste, mixed: approx. 90 t
- Other insulating material (KMF): approx. 40 t