The city of Hamm intends to completely renew the L844 Hammer Straße in the Hamm-Bockum-Hövel district in the area from Bülowstraße to Bäumerstraße.
In the course of the BA1A expansion measures, the Lippeverband, Stadtentwässerung Hamm, has already carried out the construction of new mixed water channels and, in sections, the construction of a drainage replacement system in the roadways of the affected streets.
Energie- und Wasserversorgung Hamm GmbH intends to lay supply lines.
Accommodate 12,500 m³ of superstructure, including asphalt
Paving 8,500 m² of asphalt base, binder and surface course
Set 2,100 m board and gutter 1 and 2 rows
Laying 5,800 m² of slabs and pavements in footpaths, cycle paths and parking lots
160m reinforced concrete DN 300 laying, including 3 pieces of shaft structures
Road construction
- walkways at least 1.90 m wide on both sides
- mainly on both sides, partly one-sided, 2.00m wide parking strip with tree beds
- 0.50m separation protection strip to the cycle path on both sides
- 1.85m wide protective strip for cyclists on both sides
- Road surface in a width of 6.00 m
Design of the intersection areas Bülowstraße / Hammer Straße and Hammer Straße / Friedrich-Ebert-Straße as a roundabout with a diameter of 35.00 m as well as pedestrian crossings and blind guidance system for pedestrians.
Sewer construction
In the area of the roundabout Hammer Straße / Bülowstraße, the existing rainwater channel will be taken out of operation and dismantled in some areas. A new rainwater channel is being built here for road drainage.