The subject of the contract is the design and execution of a comprehensive repair of four turnouts and the construction of two turnouts to obtain a full trapezoid to increase the capacity of line No. 61 in the field of track industry with railway traffic control equipment and overhead contact line. No change in the geometry of railway line No. 61 is planned.
Improving the functionality of the Kielce Herbskie station – construction of turnouts improving functionality – implemented as part of the project " Elimination of bottlenecks and increasing the capacity of railway lines "