Bocholter Energie- und Wasserversorgung GmbH (BEW) was commissioned by the city of Bocholt with the planning and expansion of a comprehensive, passive broadband network in the project area described in the following chapter. The aim of the state-funded project is the establishment of a future-proof and modern "Fiber to the Building" (FttB) network in the area of the so-called "white spots". These include all connections that are not min. 30 Mbit / s are available in the downstream.
The overall construction of all clusters is scheduled to begin in April 2019 and to be completed by the end of 2021.
All materials required for this are to be provided.
Microduct bandageMicroduct bandage 12 x 10/6 - 30 600 m
Cable duct16,000 m cable protection pipe diam. 125 mm, SDR 11, for flush drilling.