the purpose of this contract is to assist the environmental contracting authority (AMO) for the Watteau, Paul-Valéry and Rosiers development concession in Sarcelles (95). The overall duration of the contract is set at 4 years
The missions of the environmental AMO cover the entire operation. They include in particular: - the environmental assessment and the necessary related studies;- the realization of the impact study on the entire perimeter detailed in part 1.3;- the development and monitoring of the regulatory file of the "water law" procedure;- the translation of the environmental ambitions of the PLU and the associated documents, the energy and sustainable development specifications in the framework documents of the development concession: Ca-Hiers of general environmental requirements, environmental requirements in batch sheets...; - the design of urban scenarios and projects as part of the studies and master plans of the operation;- Assistance in the operational implementation of the principles of sustainable development: workshops, opinions on pre-PC, PC, etc.;- Participation in consultation meetings with residents and meetings with elected officials throughout the life of the project;- Specific study missions