The contract work will take place on county road 32 between Gimlevegen and Augestadvegen, with an emphasis
on the Gimlevegen — Dr. Munksgate stretch, profile 0-620 and with an option for Snarvegen and
the Hovenga roundabouts. The location is close to the centre of Porsgrunn.
The project will be carried out on the basis of drawings.
This contract work comprises, amongst other things:
Construction object 1 (‘the new county road’):
— Construction of approx. 600 m new county road on the Gimlevegen — Dr Munksgate stretch,
profile 0-620
— Construction of foot and cycle paths
— New roundabout at the junction county road 32 / Gimlevegen, profile 0-50
— New roundabout at the junction county road 32 / Dr. Munksgate, profile 550-600
— New street lights for approx. 620 m new county road, two roundabouts, Kammerherre bridge and
Gimlevegen.
— New street lights along the foot and cycle paths
— Effect lighting under the railway subway at Slottsbrugate
— Electro and CRM in the tunnel.
— CRM (Control/Registration/Monitoring) in the open air zone.
— Moving the cables and pipelines necessary for the site work
— Alteration work to existing municipal water and sewage installations.
— New surface water system for new installations and adaptations to the existing system, including a.
flood road.
— Construction of a new Lilleelv bridge
— Construction of a new Kammerherre bridge
— Noise reduction screens.
— 4 oak trees that shall be specially dealt with
— Planting
— Construction of a new technical building
— Construction of soap water tank for the Hovenga tunnel
Construction object 3 ‘the Hovenga roundabouts’:
— Expansion of the lanes in and out of the roundabouts
— Extension of 2 existing foot and cycle paths under county road 32
— Effect lighting in existing culverts
— Support walls.