This consultation concerns the construction works of the Central Kitchen of the City of Tours The future building will be built on three levels: - a garden level level: Reception, offices, changing rooms as well as a semi-underground car park with 48 spaces for light vehicles only and 30 spaces for bicycles; - A ground floor level corresponding to the kitchen process, the docks, the central laundry; - an upper level containing the accessible technical plenum and an outdoor technical terrace. For lots: 1, 4, 6, 9, 10, 11, 12, 13, 14, 15, 17, 18, 19, 20, 21, the procurement procedure used is: open tendering. Due to their estimated value, for lots: 2, 3, 5, 7, 8, 16, the procurement procedure used is: the adapted procedure opened
lot 1 - structural workBig work
Lot 10 - Hard floor coveringsHard floor covering
Lot 11 - Flexible Floor CoveringsSoft floor covering
Lot 12 - Poured floor coveringspoured flooring
lot 13 - pEINTUREPainting
Lot 14 - High and Low Current ElectricityElectricity strong and weak currents
Lot 15 - Heating / VentilationHeating / Ventilation
lot 16 - plumbing SanitarySanitary plumbing
Lot 17 - Catering EquipmentCatering equipment
Lot 18 - Refrigeration FoodFood cold
Lot 19 - Isothermal partitionsinsulated partitions
lot 2 - timber frameWood frame
Lot 20 - Elevator Applianceelevator device
lot 21 - vRDVRD
lot 3 - metal frameMetal frame
Lot 4 - Cover / Waterproofingcoverage / waterproofing
Lot 5 - FrontageFacade
lot 6 - exterior carpentryExterior wood furnishings
lot 7 - locksmithLocksmith
Lot 8 - Plastering / False CeilingPLASTERWORK / FALSE CEILING
Lot 9 - Interior joineryInterior joinery