The plant mainly comprises
— Reconstruction of existing plants.
Disassembly work
disposal
Cleaning equipment and sewer network
— Delivery and ready-to-use assembly of
—— 1 piece of extractors with plate heat recovery with steam humidification (full air conditioning),
—— 400 m
—— 400 m round pipe DN 80 to DN 400 with fittings,
—— 15 firedampers with accessories,
—— 75 grids and accessories,
—— 10 volumetric flow controllers,
And other installation components for volume flow control
— Insulation work on air conditioning systems.
This invitation to tender includes the construction of ventilation systems for the dining room, entrance hall and IMC station areas, as well as the connections to the existing facilities.
The existing lecture hall system is to be dismantled and replaced with a new system for the IMC station.