structural work
site equipment
Gerüstarbeiten DIN 18451:
component A
210 m² Fassadengerüst
Component B
1.654 m2 Fassadengerüste
1 pc stair tower
1 pcs passenger lift
1.115 m² Innengerüst, flächenorientiert
Protect 50 m² roof surfaces with building protection mats and panels
Demolition:
component A
60 m² Verblendmauerwerk
81 m² masonry
3 pcs parapet element
125 m² drywall, wall
445 m² sloping ceiling, various Executions
100 m² paving, outside
283 m² top flooring, inside
163 m² screed/ insulation/ etc.
18 pcs door elements
11 pcs window elements
27.5 m² Production opening
Earthworks DIN 18300:
Digging 250 m3 of individual foundations
570 m³ digging strip foundations
Digging 1,670 m³ of foundation
Digging 300 m³ excavation pit for existing connection
Digging 280 m³ trenches
Mauerarbeiten DIN 18330:
component A
20 m2 masonry, d = 17.5 cm
55 m2 masonry, d = 24.0 cm
5 m Betonfertigteilstürze
75 m Steinschnitt
57 m² wall out opening
Component B
345 m2 masonry, d = 17.5 cm
760 m2 masonry, d = 24.0 cm
58 pcs parapet masonry
80 m Kimmstein, d = 17.5 cm
437 m Kimmstein, d = 24 cm
1.130 m² Verblendmauerwerk
1,175 m² thermal insulation made of mineral wool
32 m Betonfertigteilstürze
75 pcs precast concrete lintels with strap veneering (approx. pcs/ 343cm)
215 m Steinschnitt
474 pcs console anchor
Concrete and reinforced concrete work DIN 18331:
Component B
110 m³ individual foundations including formwork
500 m3 strip foundations including formwork
370 m3 base plate including edge formwork
41 m³ columns including formwork
55 m³ beams including formwork
36 m³ coatings including formwork
15 m³ Drempel including formwork
18 m³ Wall-like beams including formwork
790 m³ hollow ceiling panel including formwork
8.5 m³ flat roof including formwork
2 pcs precast stair platforms
4 pcs precast staircases
205 t concrete – bar steel and reinforcing steel mats for concrete components
Various built-in parts
Waterproofing
Component B
1345 m² bituminous sealing of the base plate
270 m² bituminous sealing of the outer bases
Innenputzarbeiten
Component B
2,025 m² internal plaster as lime - cement plaster
underground pipes
Component B
60 m Leerrohr Leitungsdurchführung PVC-U
215 m Grundleitung PP-MD
Including pipe trenches (see above)
Concrete installation:
Component B
100 pieces of concrete - equipment cans
15 m concrete – lee pipe