The aim of the construction work is the construction of a high tank consisting of two water chambers with a storage volume of 12,500 m³ each and a slider chamber with a pitched roof including the technical equipment (without I&C technology).
The aim of the construction work is the construction of a high tank consisting of two water chambers with a storage volume of 12,500 m³ each and a slide chamber with a pitched roof including the technical equipment (without I&C technology), whereby the elevated tank must be completely covered in the ground and ensured for this structure that drinking water in drinking water quality can be stored in the water chambers as well as the supply and discharges and no seepage or slope water from the outside admission. The production of the underground pipelines is not part of the construction work now requested.