Manufacture / connection of district heating and turf heating.
In 2022, a building for the youth center of the 1st FC Union was erected on the construction site. In the course of this, the necessary district heating pipelines were routed to the future location of the district heating transfer stadium.
The new district heating building will be completed in spring 2023. In this, the heating of the youth centre and the turf heating of the artificial turf pitch are connected to the pre-stretched district heating line. The necessary services for the production of the connections are part of this service description.
- houseintroductions
- Pipelines and fittings
- Pressure maintenance, degassing and filling
-Insulation
- Control of turf heating, field devices (
- Control of turf heating automation stadium
- Control lawn heating control cabinet
- Control of turf heating services (commissioning, documentation, instruction of personnel)
- Control of lawn heating, electrical installation
- Electrical installation Other
- Miscellaneous (commissioning, revision documents)