Finsing Primary and Middle School; Extension of the west wing
VE 302 - Master builder work
Construction work.
01.Baustelleneinrichtung
01.01Construction site equipment of the Contractor
01.02Construction site equipment of the AG
01.03Baustellensicherung
01.04Protective measures for existing buildings
01.05Sanitary facilities
02.Ma measures for soil stabilization
02.01CSV Procedure
-Production of displacement columns floor area approx. 1150 m²
03.Concrete work in-situ concrete
03.01 Foundation foundations and cleanliness layers
-In-situ concrete Base slab reinforced concrete thickness 30-40 cm Total approx. 380 m³
03.02 In-situ concrete of walls and rising components
-In-situ concrete outer wall reinforced concrete thickness 15-25 cm
Total exposed concrete approx. 1450 m²
-In-situ concrete inner wall reinforced concrete thickness 15-25 cm
Total exposed concrete approx. 1240 m²
03.03 In-situ concrete of columns and beams
-In-situ concrete columns inside and outside, single
lengths over 3.0 – 3.5 m Total approx. 40 pcs.
-In-situ concrete beam Reinforced concrete in different
Total dimensions approx. 1125 m
03.04 In-situ concrete of the ceilings
-In-situ concrete ceiling slab horizontal, reinforced concrete
Thickness 20-30 cm Total approx. 3270 m²
03.05 In-situ concrete of the stairs
-In-situ concrete stair running plate, gradients from 21-23
made of reinforced concrete, including intermediate platform Total 2 pcs.
04.Conversion work on existing buildings
04.01Demolition and dismantling work
-Subsequent door openings in outer wall Total 3 pcs.
04.02 Making openings and recesses
-Precast lintels into existing exterior masonry
including manufacture of support bags Total 3 pcs.