design and construction of new installations including the reinforcement of the fire protection of the Concarneau waste-to-energy unit (UVE); Water management with rainwater recovery and wastewater reuse to reduce the consumption of city and borehole water and reduce the volume of discharges to the wastewater system. The project to be carried out falls within the scope of Book IV of the Public Procurement Code relating to public contracts related to public project management and private project management (ex Mop law)
structural work, second work, VRD, water managementstructural work, second contract, VRD and electrical installation control command for water management
fire protectioninstallation of fire protection equipment, pumps, piping, and electrical control installation
Electricity and connectionsElectrical installation work for fire protection and water management installations