Lichtbergschule Eiterfeld, new administration — drywall work.
The client is planning the construction of a new building for administration in Eiterfeld as part of the overall measure for the new construction of the Lichtberg School Eiterfeld, as an early partial construction project on an existing 3-storey primary school building, which will be erected in monolithic construction.
The building body to be created is a very simple structure.
— component management — 43.5 m x 14.5 m,
— Storey: 2 full floors.
Short description Gewerk: Drywall work
— walls single 125 mm approx. 330 sqm,
— installation walls 25 cm approx. 23 sqm,
— installation walls 35 cm approx. 22 sqm,
— double walls approx. 340 sqm,
— attachment trays approx. 44 sqm,
— Temporary walls approx. 180 sqm,
— ceiling frieze approx. 190 sqm,
— raster ceiling 20 mm approx. 620 sqm,
— grid ceiling 15 mm approx. 180 sqm,
— wall angle raster ceiling approx. 310 m,
— picture bar raster ceiling approx. 220 m,
— picture bar GK frieze approx. 90 m