Extension of Bettingen waterworks,
Construction of a SF6 medium-voltage system incl. 1250 kVA transformer, low-voltage main distribution and concrete station
In the course of the construction project, a concrete station (including building services and lightning protection) is to be supplied and set up as an energy connection for WW Bettingen.
In the concrete station, the following components are also to be delivered and installed in the course of the construction project: an SF6 medium-voltage switchgear, a low-voltage main distribution system and a medium-voltage dry-type transformer (1250kVA). All components must be connected ready for operation and put into operation. The required excavation pit is created on site.