As part of the reconstruction, the client would like to restore the flood-destroyed fire brigade in Ahrweiler at a different location as a replacement building with 11 parking spaces for fire engines. In doing so, current findings in flood prevention are to be taken into account by means of an elevated construction method. The subject of this award procedure is the planning services for technical equipment § 55 HOAI 2021 - LPH 1-9 (plant groups 1, 2, 3, 7). Special services as required.
see above II.1.4