The subject of the submission is the construction work for a new sewage system with a sewer as an external work Sax on the association canal to the new ARA Upper Engadine, which includes the work until November 2020 (until sewer completion). The scope is described in detail in the LV specifications and is only reproduced here in short form:
- excavation 6 000 m
- GRP pipes DN400 - 12 m, DN600 - 90 m, DN1300 - 220 m,
- Manholes in GRP and in-situ concrete.
The subject of the submission is the construction work for a new sewage system with a sewage canal as the Sax external branch on the association canal for the new ARA Upper Engadine, which includes the work until November 2020 (until sewage completion). The scope is described in detail in the LV specifications and is only reproduced here in short form:
- excavation 6 000 m
- GRP pipes DN400 - 12 m, DN600 - 90 m, DN1300 - 220 m,
- Manholes in GRP and in-situ concrete.