Provision of planning services for upgrading the Heimbach wastewater treatment plant—
The essential planning contents are:
• Demolition trickling filter
• New construction of a lightweight computer building with exhaust air system—
• Rake and sand trap as a compact system—
• Conversion of the company building—
• Ventilation blower station is to be installed and encased at the aeration tank—
• Replacement of aeration units for the aeration tank—
• Remediation of the drainage channel and the reamer of the secondary sedimentation tank (NKB) —
• the Königstuhl is to be optimized by attaching the hood and the diving wall and tooth threshold renewed—
• Acquisition of a new centrifuge for sludge dewatering—
• New process water storage tank
provision of planning services for the upgrading of the Heimbach sewage treatment plant
Award of engineering services for:
1.) the object planning according to HOAI part 3 § 41ff, LP 5 to 9, Hz 3-
Special services: -
1.1) local construction supervision
1.2) Creating inventory plans
1.3) Checking and values of ancillary offers
1.4) Review of supplements
1.5) Monitoring the rectification of defects
—
2.) the specialist planning/structural planning according to HOAI part 4 § 49ff, LP 3 to 6, Hz 3
Special services: -
2.1) Additional work for special designs and special designs-
—
3.) the technical planning/technical equipment according to HOAI part 4 § 53ff, LP 1 to 3 AG 7.2, Hz3-
(electro-technical planning only) -
Special services: -
3.1) Inventory of existing plant-
—
4.) the technical planning/technical equipment according to HOAI part 4 § 53ff, LP 5 to 9 AG 7.2, Hz 3-
(complete) -
Special services: -
4.1) Participation in the review of offers justified in the construction industry (claim defense) -
4.2) Checking and values of ancillary offers
4.3) Monitoring the rectification of defects
4.4) Compiling the specifications
4.5) Creation of measuring point and consumer lists
4.6) Create and adjust P&I schematics
—
The Heimbach wastewater treatment plant is to be improved. For this purpose, a lightweight computer building is to be built at the current location of the trickling filter. The trickling filter must be torn down to foundation level. A compact computer and sand trap system is to be erected in the new computer building.
The company building also needs to be converted. Among other things, the blower station of the aeration tanks (BB) must be moved out of the company building. In future, the new blowers will be installed directly at the aeration tanks. A suitable enclosure must be provided for the blowers. In addition, the aeration units in the aeration tanks must be replaced.
The drainage channel and the scraper of the secondary sedimentation tanks (NKB) must be rehabilitated. The Königstuhl is optimized by installing a hood and the diving wall and the spike threshold are renewed.
The centrifuge for sludge dewatering must be replaced. Accommodation in the company building (BG) must be provided. The former installation site of the former centrifuge is available for this purpose. The outgoing centrifuge is already disassembled. A process water storage tank is to be set up for the centrate water from the centrifuge.