Solar photovoltaic modules | Tenderlake

Solar photovoltaic modules

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
16 July 2021
Closing Date:
18 August 2021
Location(s):
PL81 Lubelskie (PL Poland/POLSKA)
Description:
Supply and installation of photovoltaic installations, solar installations and biomass boilers in the municipality of Uścimów

1. The subject of the order is the delivery and installation of photovoltaic installations and solar collectors and biomass boilers in the municipality of Uścimów. The order is implemented as part of the project “RES Investment in the Municipality of Uścimów” co-financed by the EU under the Regional Operational Programme of Lublin Voivodeship 2014-2020 priority axis 4 environmentally friendly energy action 4.1. Support for the use of RES.

2. The Contracting Authority pursuant to Article 91 of the Pzp Act allows the submission of partial tenders, broken down into three parts of the contract:

1) Part 1 — delivery and installation of photovoltaic cells;

2) Part 2 — delivery and assembly of solar collectors;

3) Part 3 — delivery and assembly of biomass boilers.

Supply and installation of photovoltaic cells

1. The subject of Part 1 of the order is the delivery and installation of PV installations in the territory of the municipality of Uścimów, including, inter alia:

1) supply and installation of 29 pcs of photovoltaic installations with a power of min. 3.1 kW, in 29 indicated locations, including 21 installations mounted on an apartment building, 5 installations mounted on a farm building, 3 installations mounted on the ground;

2) supply and installation of 22 pcs of photovoltaic installations with a power of min. 4.34 kW, in 22 indicated locations, including 12 installations mounted on an apartment building, 9 installations mounted on a farm building, 1 installation on the ground;

3) supply and installation of 29 pcs of photovoltaic installations with a power of min. 4.96 kW, in 29 indicated locations, including 14 installations mounted on an apartment building, 9 installations mounted on a farm building, 6 installations mounted on the ground;

4) installation made on the basis of modules of monocrystalline photovoltaic panels with a power of min. 340 W;

5) installation of support structures of photovoltaic modules;

6) installation of photovoltaic panels on the structure;

7) installation of solar wiring between modules and inverter;

8) making the main installation for connecting the inverter to the main switchboard of the building;

9) installation of a switchboard of RDC DC DC circuits;

10) installation of the inverter;

11) installation of RAC switchgear switchgear switchgear unit;

12) the performance of anti-shock protection;

13) the performance of surge protection;

14) trials, measurements, adjustment and technological start-up of the plant;

15) the execution of abbreviated post-construction documentation for each project participant and full post-construction documentation for the Contracting Authority (certificates, guarantees, instructions for operation, implementation projects, set of electrical measurements, set of documents to change the meter, documentation received from Ordering Party with red-colored corrections);

16) connection to the PGE Distribution S.A. network, together with the preparation of a set of documents and the declaration of installation;

17) training users in the proper operation of the installations performed;

18) drawing up service instructions containing the necessary information on how to proceed in the event of unexpected errors in the installation;

19) program and launch of the installation;

20) supplement possible cavities of walls, ceilings, sealing the roofing material after the passages of the wires;

21) other elements included in Annex No 8a to the SWZ (design documentation) and the contract template of Annex 7a to the SWZ).

2. The Contracting Authority requires that the installation in one location takes no more than 3 working days following each other.

3. For the warranty period, the Contractor shall be obliged to perform all service activities required by suppliers of assembled equipment (services, reviews, etc.) in order to maintain the manufacturer's warranty.

4. The Contractor shall grant warranties and guarantees for the works performed for a period of not less than 3 years and not more than 5 years from the date of signing by the Contracting Authority and the Contractor of the final acceptance protocol (the guarantee period is one of the criteria for evaluation of tenders described in Chapter XVIII of the SWZ).

5. The order should be executed, inter alia, in accordance with the technical documentation of Annex/Annexes No 8a to the SWZ.

6. Equipment, fittings and accessories installed during the contract must be brand new, in accordance with the parameters specified in the technical documentation.

7. Implementation of the object of the contract should be carried out on the basis of the applicable provisions, in particular the Act of 7 July 1994. Construction Law (Journal of Laws of 2020, item 1333, as amended), together with the implementing provisions, by the Contractor with the relevant experience, executive potential, and having persons with relevant experience and qualifications.

Supply and installation of photovoltaic cells

1. The subject of Part 1 of the order is the delivery and installation of PV installations in the territory of the municipality of Uścimów, including, inter alia:

1) supply and installation of 29 pcs of photovoltaic installations with a power of min. 3.1 kW, in 29 indicated locations, including 21 installations mounted on an apartment building, 5 installations mounted on a farm building, 3 installations mounted on the ground;

2) supply and installation of 22 pcs of photovoltaic installations with a power of min. 4.34 kW, in 22 indicated locations, including 12 installations mounted on an apartment building, 9 installations mounted on a farm building, 1 installation on the ground;

3) supply and installation of 29 pcs of photovoltaic installations with a power of min. 4.96 kW, in 29 indicated locations, including 14 installations mounted on an apartment building, 9 installations mounted on a farm building, 6 installations mounted on the ground;

4) installation made on the basis of modules of monocrystalline photovoltaic panels with a power of min. 340 W;

5) installation of support structures of photovoltaic modules;

6) installation of photovoltaic panels on the structure;

7) installation of solar wiring between modules and inverter;

8) making the main installation for connecting the inverter to the main switchboard of the building;

9) installation of a switchboard of RDC DC DC circuits;

10) installation of the inverter;

11) installation of RAC switchgear switchgear switchgear unit;

12) the performance of anti-shock protection;

13) the performance of surge protection;

14) trials, measurements, adjustment and technological start-up of the plant;

15) the execution of abbreviated post-construction documentation for each project participant and full post-construction documentation for the Contracting Authority (certificates, guarantees, instructions for operation, implementation projects, set of electrical measurements, set of documents to change the meter, documentation received from Ordering Party with red-colored corrections);

16) connection to the PGE Distribution S.A. network, together with the preparation of a set of documents and the declaration of installation;

17) training users in the proper operation of the installations performed;

18) drawing up service instructions containing the necessary information on how to proceed in the event of unexpected errors in the installation;

19) program and launch of the installation;

20) supplement possible cavities of walls, ceilings, sealing the roofing material after the passages of the wires;

21) other elements included in Annex No 8a to the SWZ (design documentation) and the contract template of Annex 7a to the SWZ).

2. The Contracting Authority requires that the installation in one location takes no more than 3 working days following each other.

3. For the warranty period, the Contractor shall be obliged to perform all service activities required by suppliers of assembled equipment (services, reviews, etc.) in order to maintain the manufacturer's warranty.

4. The Contractor shall grant warranties and guarantees for the works performed for a period of not less than 3 years and not more than 5 years from the date of signing by the Contracting Authority and the Contractor of the final acceptance protocol (the guarantee period is one of the criteria for evaluation of tenders described in Chapter XVIII of the SWZ).

5. The order should be executed, inter alia, in accordance with the technical documentation of Annex/Annexes No 8a to the SWZ.

6. Equipment, fittings and accessories installed during the contract must be brand new, in accordance with the parameters specified in the technical documentation.

7. Implementation of the object of the contract should be carried out on the basis of the applicable provisions, in particular the Act of 7 July 1994. Construction Law (Journal of Laws of 2020, item 1333, as amended), together with the implementing provisions, by the Contractor with the relevant experience, executive potential, and having persons with relevant experience and qualifications.

Supply and installation of photovoltaic cells

1. The subject of Part 1 of the order is the delivery and installation of PV installations in the territory of the municipality of Uścimów, including, inter alia:

1) supply and installation of 29 pcs of photovoltaic installations with a power of min. 3.1 kW, in 29 indicated locations, including 21 installations mounted on an apartment building, 5 installations mounted on a farm building, 3 installations mounted on the ground;

2) supply and installation of 22 pcs of photovoltaic installations with a power of min. 4.34 kW, in 22 indicated locations, including 12 installations mounted on an apartment building, 9 installations mounted on a farm building, 1 installation on the ground;

3) supply and installation of 29 pcs of photovoltaic installations with a power of min. 4.96 kW, in 29 indicated locations, including 14 installations mounted on an apartment building, 9 installations mounted on a farm building, 6 installations mounted on the ground;

4) installation made on the basis of modules of monocrystalline photovoltaic panels with a power of min. 340 W;

5) installation of support structures of photovoltaic modules;

6) installation of photovoltaic panels on the structure;

7) installation of solar wiring between modules and inverter;

8) making the main installation for connecting the inverter to the main switchboard of the building;

9) installation of a switchboard of RDC DC DC circuits;

10) installation of the inverter;

11) installation of RAC switchgear switchgear switchgear unit;

12) the performance of anti-shock protection;

13) the performance of surge protection;

14) trials, measurements, adjustment and technological start-up of the plant;

15) the execution of abbreviated post-construction documentation for each project participant and full post-construction documentation for the Contracting Authority (certificates, guarantees, instructions for operation, implementation projects, set of electrical measurements, set of documents to change the meter, documentation received from Ordering Party with red-colored corrections);

16) connection to the PGE Distribution S.A. network, together with the preparation of a set of documents and the declaration of installation;

17) training users in the proper operation of the installations performed;

18) drawing up service instructions containing the necessary information on how to proceed in the event of unexpected errors in the installation;

19) program and launch of the installation;

20) supplement possible cavities of walls, ceilings, sealing the roofing material after the passages of the wires;

21) other elements included in Annex No 8a to the SWZ (design documentation) and the contract template of Annex 7a to the SWZ).

2. The Contracting Authority requires that the installation in one location takes no more than 3 working days following each other.

3. For the warranty period, the Contractor shall be obliged to perform all service activities required by suppliers of assembled equipment (services, reviews, etc.) in order to maintain the manufacturer's warranty.

4. The Contractor shall grant warranties and guarantees for the works performed for a period of not less than 3 years and not more than 5 years from the date of signing by the Contracting Authority and the Contractor of the final acceptance protocol (the guarantee period is one of the criteria for evaluation of tenders described in Chapter XVIII of the SWZ).

5. The order should be executed, inter alia, in accordance with the technical documentation of Annex/Annexes No 8a to the SWZ.

6. Equipment, fittings and accessories installed during the contract must be brand new, in accordance with the parameters specified in the technical documentation.

7. Implementation of the object of the contract should be carried out on the basis of the applicable provisions, in particular the Act of 7 July 1994. Construction Law (Journal of Laws of 2020, item 1333, as amended), together with the implementing provisions, by the Contractor with the relevant experience, executive potential, and having persons with relevant experience and qualifications.

Download full details as .pdf