VE046 Maintenance (exterior), earthworks and steel construction
Excavated earth: 110 m3,
Installation floor material: 65 m3,
Dispose of excavated earth: 45 m3,
Supply and installation of crushed stone: 17 m3,
Production of reinforced concrete foundations: 15 m3, steel structure: 29 t,
Trapezoidal sheet metal 85/ 280: 165 m2,
Trapezoidal sheet metal 35/ 207: 165 m2