The Erfurter Bahn GmbH awards i. A. Süd-Thüringen-Bahn GmbH Construction work for the construction of a new service workshop in Meiningen. Here production of an exhaust gas extraction system.
Diesel exhaust extraction system for four workstations of diesel railcars / locomotives over two tracks with a total length of 2 x 67 m with a total of four remotely controlled exhaust gas detection units and an additional 4 hose reels.
A stationary wall-mounted suction unit with hose reel is also required for the mechanical workshop.
A sound-insulated fan unit, which is mounted on the hall roof, is required for the entire system.