New construction of the extension of the Mecklenburger Allee from the residential area Rostock-Auf dem Kalverradd to the Elmenhorst bypass. Renewal including street lighting, bus stops, greenery, noise protection systems and drinking water pipes.
Lot 1 - road construction including lighting and rainwater drainage- 3 200 m
- 11,000 m
- 20 200 m
- 1 200 m subgrade drainage,
- 1 055 m rainwater sewer PP DN 200-400,
- 80 m rainwater sewer concrete DN 1000,
- 23 manholes DN1000,
- 2 shafts DN2000,
- 8 500 m
- 4,200 m
- 1,800 m shelf,
- 1,650 m crash barriers, lane markings, traffic signs and equipment, lawn sowing including completion maintenance,
- 3 lights including cable work.
Lot 2 - new construction of 2 bus stops- 25 m
- 60 m
- 80 m
- 30 m
- 80 m
- 14 m crossing stone system,
- 20 m angle support elements,
- 6 bicycle stand brackets.
Lot 3 - compensatory and replacement measures- 181 standard tree plantings including completion care and 3 years development care,
- 4 770 m
- 300 m game protection fence with gate and stepover,
- 1 250 m
- 2 450 m
- 1 700 m
- 900 m
- 650 m
- 1 714 m
- 2 450 m
- 836 m
- 210 m
- Create 280 m of in-situ concrete bored pile, DU = 70 cm,
- 86 posts for LSW HEA / HEB 160 L = 3.5 to 4.0 m,
- 365 m
- 156 m
- 820 m pressure pipeline da 250 x 22.7 PE 100 (SDR 11) in open construction (pipe cover 1.35 m),
- 560 m pressure pipeline da 250 x 22.7 PE 100 (SDR 11) in closed construction (HDD process).