o Studies (cf. § 9 of the CDC)
o Realization (cf. § 10 and 11 of the CDC)
o Factory testing and testing (see § 11 of the CDC)
o Factory recipe (cf. § 11.4 of the CDC)
o Repeats and end of on-site trials (cf § 12 of the CDC),
o Provision of a DOE (see § 15 of the CDC)
CAD studies (3D) and realization of manufacturing plans (2D).
Earthquake sizing calculation note.
Fall sizing calculation note.
Detailed editing kinematic note.
o Realization (cf. § 10 and 11 of the CDC)
Supply of materials and materials, manufacture of fittings, carrying out controls during manufacture.
Assembly of the facilities according to the established kinematics.
o Factory testing and testing (see § 11 of the CDC)
Functional testing in the factory according to the established testing program.
o Factory recipe (cf. § 11.4 of the CDC)
Evaluation of the conformity of the facilities by the CEA before dispatch (CEA convocation).
On-site delivery.
o Repeats and end of on-site trials (cf § 12 of the CDC),
On-site tests carried out by the CEA.
Provision of a DOE (see § 15 of the CDC)
Final recipe pronounced by the CEA once the arrangements are mounted in cell 2.
DOE Compliance Delivered
Out of package: 1 day of Technical Assistance during assembly (x 10 days) during site tests.
Out of package: 25 days for conception
Out of package: the realization of storage equipment on prior estimate and on the basis of 10% of the market
Optional: Earthquake sizing calculation note in the “anchored configuration”.