B462, rescue staircase extension tunnel Gernsbach
- 4 x structural engineering, object planning,
- 4 x site equipment,
- Excavation excavation 1 900 m
- Chute breakage VKL S1 = 720 m
- Chute breakage VKL S2 = 1 000 m
- Tunnel break VKL 3 = 360 m
- Tunnel break VKL 4 = 875 m
- Tunnel break VKL 6 = 600 m
- Sheet piling = 850 m
- Bohrträgerverbau = 130 m
- Securing shotcrete up to d = 30 cm = 2 500 m
- securing by anchor = 1 000 pcs,
- Reinforced concrete = 1 500 m
- reinforcing steel = 216 t,
- sealing = 2 100 m
- hipped roof ALU = 250 m
- Disposal = Z2 material (arsenic loaded) = 5 200 t,
- 4 x drainage incl. Settling tank, neutralization plant.