Replacement of the southern elevated road, section of the Ludwigshafen mushroom elevated road in the course of the B37; here: Safety and Health Protection Coordination (SiGeKo):
In the course of the construction project to replace the southern elevated road, section "Pilzhochstraße" in Ludwigshafen in the course of the B37, the replacement building is to be built to close the gap between the "White Elevated Road" in the west and the remaining abutments at the Walzmühle in the east. The scope of services also includes the reconnection of the ramp connections, the repair of the remaining retaining walls and the adaptation of existing systems. The areas under the structure are being prepared for a later redesign.
The replacement building is to be erected on the site and in the extensive outlines of the "old mushroom high road". The implementation plans for the engineering structures and traffic facilities are to be drawn up.
Assumption of the services for safety and health protection coordination according to the requirements of the construction project.